INDUSTRIAL ASIC HOSTING
Alberta Pool + 6 cents (CAD) / kWh
Dedicated FortisAB Transformer | Alberta Based | No U.S. Tax Filings
INDUSTRIAL POWER. ALBERTAN STABILITY.
.png)

HOSTING TERMS AND CONDITIONS
Version: 2026.11
Current Facilities
Facility: 200 KW Upstream Data Hash Hut (Alberta, Canada) - Completed (At Capacity).
Power Source: 200 KW FortisAB Grid Feed with Onsite 225 kVA 480/277V Padmount Transformer.
Facility: 2.5MW Industrial Scale Building - AlphaOne (Alberta, Canada) - Expected 2027/28.
Power Source: 2,500 KW FortisAB Grid Feed with Onsite 3,000 kVA 480/277V Padmount Transformer, Stepped Down to 416Y/240V.
1. Technical Infrastructure & Electrical Compatibility
Facility Infrastructure
Polyflex Capital Corp. operates industrial digital infrastructure and ASIC mining hosting facilities in Alberta, supported by dedicated FortisAlberta electrical distribution infrastructure.
AlphaOne – 2.5 MW Facility
-
Utility Connection: 2.5 MW FortisAlberta electrical service connection.
-
Transformer Capacity: 3,000 kVA FortisAlberta transformer.
-
Primary Distribution: 277/480V.
-
Secondary Distribution: Stepped down to 416Y/240V for facility distribution and mining equipment operations.
Upstream Data Hash Hut – 200 kW Facility
-
Facility Capacity: 200 kW.
-
Utility Connection: Dedicated 225 kVA FortisAlberta transformer.
-
Electrical Supply: 277/480V, supplied directly from the transformer.
Hardware Compatibility
-
Polyflex accepts compatible ASIC mining hardware with power supplies rated for the applicable facility voltage. Depending on the hosting location, this may include 240V and 277V-compatible equipment.
-
Clients must verify electrical specifications, phase requirements, amperage, connectors, and power supply compatibility before shipping. Polyflex reserves the right to refuse equipment that is electrically incompatible with the designated facility.
Monitoring & Consumption
-
Individual equipment consumption will be monitored where metering and monitoring infrastructure permits. Electricity consumption and applicable hosting charges will be calculated in accordance with the pricing provisions outlined below.
2. Subscription & Electricity Pricing
Industrial ASIC Hosting Rate
-
Polyflex Capital Corp. provides industrial ASIC hosting at a variable monthly electricity rate calculated using the published 30-day average Alberta Pool Price, plus a fixed hosting margin of $0.06 CAD per kWh.
Monthly Pricing Benchmark
-
Benchmark: Published AESO 30-day average Alberta Pool Price.
-
Pricing Date: The 15th calendar day of each month.
-
Hosting Margin: $0.06 CAD / kWh.
-
Client Electricity Rate: Published 30-day average Alberta Pool Price + $0.06 CAD / kWh.
_________________________________________________________________________________________
-
The applicable monthly electricity rate will be established using the published AESO 30-day average Pool Price available on the 15th of each month and will apply to the subsequent billing period until the next pricing adjustment.
-
This pricing structure provides clients with a predictable monthly electricity rate while maintaining transparency with respect to Alberta's wholesale electricity market.
-
The Alberta Pool Price component reflects prevailing wholesale electricity market conditions over the applicable 30-day averaging period. The published daily and 30-day average Pool Prices are available through the Alberta Electric System Operator (AESO):
Monthly Billing & Consumption
-
Electricity charges will be calculated using an agreed daily kWh consumption baseline for each hosted unit.
-
At the commencement of hosting, Polyflex and the client will establish an agreed average daily electricity consumption baseline based on the equipment model, rated power consumption, and expected continuous operating conditions.
-
The applicable monthly AESO 30-day average Pool Price, established on the 15th, will determine the electricity rate for the subsequent billing period.
-
The fixed hosting margin of $0.06 CAD/kWh will be added to the applicable Pool Price.
-
Monthly charges will be calculated using the agreed daily consumption baseline multiplied by the number of billable operating days.
-
Any changes to equipment configuration or agreed consumption baselines must be mutually agreed upon by Polyflex and the client.
-
Invoices will be issued monthly unless otherwise agreed in writing.
Equipment Downtime & Electricity Credits
-
Polyflex recognizes that ASIC mining equipment may experience downtime due to hardware failures, repairs, maintenance, or other operational issues.
-
Where a hosted unit is taken offline and unavailable for hashing operations, the client will receive an electricity credit for the applicable period of downtime, calculated using the unit's agreed daily electricity consumption baseline.
-
The following conditions apply:
-
Downtime must be identifiable and reasonably verifiable through facility monitoring, equipment records, or maintenance documentation.
-
Credits are only provided for complete consecutive 24-hour periods of verified downtime. Partial days, including any period of downtime shorter than 24 consecutive hours, are not eligible for credits.
-
The downtime period begins when the equipment is confirmed offline and ends when the equipment is restored to operational status.
-
The applicable electricity rate used to calculate the credit will be based on the published AESO 30-day average Pool Price available on the 15th of the month following the outage, plus the $0.06 CAD/kWh hosting margin.
-
Credits will be applied to the client's subsequent hosting invoices.
-
Credits are calculated on the unused electricity allowance and are not cash refunds.
-
Where equipment is offline for multiple consecutive days, only complete 24-hour periods will qualify for credits.
-
-
For clarity, if a miner with an agreed baseline of 84 kWh per day is offline for five days and six hours, the client will receive a credit equivalent to 420 kWh. The additional six hours will not qualify for a credit.
-
Credits will be reflected on the next available invoice following calculation.
Payment Terms
-
All invoices are payable in accordance with the payment terms established by Polyflex Capital Corp.
-
Clients are responsible for all applicable hosting and electricity charges, less any approved downtime credits.
-
Outstanding balances remain subject to the default and non-payment provisions outlined in these Terms and Conditions.
AESO Market Reference:
3. Shipping, Handling & Verification
Inbound Logistics
-
Clients are responsible for all shipping costs, insurance, and transit risks.
-
International shipments must be sent DDP (Delivered Duty Paid).
-
Polyflex reserves the right to refuse shipments arriving with unpaid duties, taxes, or brokerage fees.
Initial Power-On Test
-
Upon arrival, Polyflex performs a basic Power-On Test to verify that the power supply engages and the miner controller successfully connects to the network.
-
This test is a preliminary operational check only and does not guarantee long-term hashing stability, chip health, or overall hardware condition. Polyflex is not responsible for equipment arriving Dead on Arrival (DOA).
Outbound / De-Racking
-
A $50.00 CAD per-unit de-racking fee applies upon equipment removal.
4. Maintenance, Repairs & Transport
Basic Remote Hands
Basic remote assistance is included and may consist of:
-
Equipment reboots.
-
Power and network cable checks.
-
Basic visual inspections.
-
Preliminary troubleshooting.
Repair Responsibility
-
Polyflex does not perform board-level repairs or specialized ASIC hardware servicing. Clients are solely responsible for arranging and paying for repairs through their chosen third-party repair technician.
-
Polyflex utilizes SustainHash Technologies for its own miner repairs in the province.
Transport Service
-
For a $100.00 CAD round-trip fee per service occurrence, Polyflex will transport client hardware to a designated repair facility within Edmonton or Calgary and return the equipment to the hosting site once repairs are completed.
-
All third-party repair costs, parts, and associated service charges remain the responsibility of the client.
5. Non-Payment & Default Policy ("Kill Clause")
10 Days Past Due
-
If an invoice remains unpaid by the 10th of the month, Polyflex reserves the right to immediately disconnect the affected equipment from electrical power and suspend hashing operations.
Storage Transition
-
Disconnected equipment will transition to the Flex-Storage rate of $35.00 CAD per unit, per month.
Commercial Lien
-
To the extent permitted by applicable Alberta law, Polyflex Capital Corp. reserves its rights to exercise a commercial lien or other lawful security remedies over client hardware for unpaid hosting fees, electricity charges, storage charges, and other outstanding amounts.
-
Equipment will not be released until all outstanding balances have been settled in full, subject to applicable law.
Liquidation
-
If an account remains in default for 60 days, Polyflex reserves the right to pursue lawful enforcement remedies, including the sale or liquidation of equipment where legally permitted, to recover outstanding balances and associated costs. All required notices and statutory procedures will be followed.
6. Service Level Agreement (SLA) & Liability
Uptime Objective
-
Polyflex targets 97% facility availability.
-
This is an operational objective and not a guaranteed uptime commitment.
-
Scheduled utility maintenance, electrical infrastructure work, emergency maintenance, equipment maintenance, and circumstances outside Polyflex's reasonable control are excluded from the uptime calculation.
Curtailment & Electrical Management
Polyflex reserves the right to reduce, suspend, or temporarily disconnect electrical supply to client equipment when necessary, including but not limited to:
-
Extreme electrical grid stress.
-
Extreme pricing events (over $200 MWh).
-
AESO-directed or utility-mandated curtailment.
-
FortisAlberta service interruptions or maintenance.
-
Electrical infrastructure protection.
-
Transformer or distribution equipment maintenance.
-
Facility emergencies or conditions presenting a risk to personnel, equipment, or infrastructure.
Polyflex may also implement operational load management when necessary to protect the reliability and stability of its facilities.
Insurance
-
Polyflex does not provide insurance coverage for individual client mining hardware. Clients are responsible for maintaining adequate property, equipment, and in-transit insurance.
Fire, Catastrophic Events & Equipment Loss
-
Polyflex Capital Corp. is not responsible for the loss, destruction, or damage of client-owned mining equipment resulting from fire, smoke, electrical faults, power surges, transformer failures, overheating, natural disasters, or other catastrophic events affecting the hosting facility, except to the extent directly caused by Polyflex's negligence, wilful misconduct, or other circumstances for which liability cannot lawfully be excluded.
-
Clients acknowledge that industrial mining operations involve inherent electrical, thermal, and operational risks. Clients are solely responsible for maintaining adequate insurance coverage for the full replacement value of their equipment, including coverage for fire, electrical damage, and other applicable risks.
-
In the event of a fire or other catastrophic incident resulting in the total loss of client equipment, Polyflex will have no obligation to replace, reimburse, or compensate the client for the value of the lost equipment, subject to applicable law.
-
Polyflex will make reasonable efforts to notify affected clients of any incident impacting their equipment and provide relevant information concerning the incident where reasonably available.
Mining Revenue & Custody
-
Polyflex Capital Corp. does not take custody or control of client mining revenue. All hashpower is directed to the client's designated mining pool.
-
Clients are solely responsible for pool configuration, wallet addresses, payout arrangements, and the security of their mining revenue.
Limitation of Liability
-
Polyflex Capital Corp. is not responsible for lost mining revenue, anticipated profits, or other indirect or consequential losses resulting from electrical interruptions, downtime, latency, utility disruptions, curtailment, maintenance, or hardware failure.
-
Nothing in these terms excludes liability that cannot lawfully be excluded under applicable law.
7. Termination
Month-to-Month Subscription
-
Hosting services operate on a month-to-month basis.
Notice Period
-
Clients must provide 30 days' written notice to cancel their subscription and arrange equipment removal.
-
All outstanding electricity charges, hosting fees, storage charges, and applicable removal fees must be paid before equipment is released.
8. Amendments & Fair Exit Policy
Right to Modify
-
Polyflex Capital Corp. reserves the right to amend these Terms and Conditions to reflect changes in energy costs, utility charges, market conditions, infrastructure requirements, regulatory obligations, or facility operations.
Notice of Changes
-
Clients will receive at least 30 days' notice of material changes to these Terms and Conditions or hosting prices before the changes take effect.
Fair Exit Option
-
If a client does not agree with amended terms or pricing, they may terminate their subscription and arrange for equipment removal without the standard 30-day notice requirement, provided their request is submitted within 14 days of receiving the amendment notice.
-
All outstanding balances for previously provided services, including electricity charges, hosting fees, and storage charges, must still be settled before equipment release.
Authorized by:
Management, Polyflex Capital Corp.
Digital Infrastructure Operations